Electroplating Company
Location: Suqian, Shuyang
Scale: 23,000 ㎡
Time: 2024
Project introduction:
This project is the comprehensive construction of a large-scale electroplating industrial plant in Muyang, Suqian, covering a total area of 23,000 square meters. Adhering to the principles of high-starting point planning and high-standard construction, the project provides an integrated comprehensive solution of "design-construction-environmental protection treatment", effectively meeting the stringent environmental and production environment requirements of the electroplating industry.
Core construction content and comprehensive capability manifestation:
Core industrial space development:
1. Modern industrial plant: The construction includes large production workshops (including multi-story structures) and related ancillary facilities. The construction standards are strict, and the on-site management is standardized and orderly (see on-site construction drawings). 2. High-standard purification workshop:
As the core of the project, the purification workshop utilizes high-quality materials (such as wear-resistant and corrosion-resistant green epoxy floor paint and clean walls), with a scientific zoning layout (clear functional areas such as raw material area, electroplating line, and passageway), supplemented by a professional and sufficient clean lighting system (long strip lights/square lamps), to ensure that the stringent requirements for cleanliness, temperature, and humidity in precision electroplating processes are met (see the actual interior image of the workshop).
`Environmental protection treatment system (top priority): 1. Exhaust gas treatment: Equipped with large-scale professional exhaust gas treatment towers and supporting pipeline systems (see cylindrical exhaust gas treatment equipment diagram), it effectively collects and treats harmful gases such as acid mist and chromium mist generated during the electroplating process, ensuring emissions meet standards.
2. Wastewater/waste liquid treatment: Establish specialized wastewater treatment stations and corresponding pipelines, equipped with dedicated collection and storage facilities (such as special containers for "acid-containing waste liquid"). Strictly implement separate collection, classified treatment, and advanced purification for electroplating wastewater containing heavy metals, acids, and alkalis, to ensure environmental safety.
Comprehensive supporting facility construction:
1. Main structure and enclosure: This includes the construction of high-standard steel structure factories (see structural detail drawings) and the enclosure system.
2. Outdoor engineering: Implement road hardening in the factory area, comprehensive layout of outdoor pipelines, and overall greening landscape projects (see factory area greening and open space), to enhance the environmental quality of the factory area. 3. Auxiliary facilities: Include details such as safety exits, guardrails (yellow and black warning colors), and signage systems.
Project value and comprehensive capability:
This project fully demonstrates the comprehensive solution capabilities of fencing in the field of large industrial plant renovation: from overall planning, steel structure construction (including steel structure), fine decoration (core purification space), complex electromechanical installation to professional environmental protection treatment system integration, achieving one-stop delivery. The project strictly follows industrial safety and environmental protection regulations (construction site management regulations, complete safety signs), and with a professional team of Grade B design and Grade II construction, it has successfully built a modern electroplating industrial benchmark base with complete functions, environmental compliance, and efficient operation.








